Reinforced concrete floor slab under construction with the site team at work

Residential Construction Across Assam

Your land.
Our engineering.
A home that holds.

We design, build and hand over private homes and housing developments across Assam — on a fixed schedule, against a quality standard we publish in full.

Our Construction Packages

Three Packages.
One Standard of Safety.

Structural design, soil investigation, earthquake-resistant detailing and concrete quality remain identical across all three packages.

Guwahati falls in Seismic Zone V — the highest seismic risk category under India's current earthquake code. Structural compromise is never an option at any price point. What changes between our packages is finish quality, brand tier, fitting specification and level of customisation.

We do not build a weaker house for a smaller budget.

Solid, honest, no-frills

Basic Class

Every structural standard we apply to our premium homes, delivered with dependable, no-nonsense finishes. The foundation, the steel, the seismic detailing and the soil testing are exactly what a luxury client receives. What you save on is finish tier, not safety. Ideal for first homes, rental properties and anyone who wants a sound structure without paying for imported marble.

  • Best for: First home, rental property, budget-conscious build
  • Design revisions: 2 rounds
  • Site supervision: Weekly visit
  • Defect liability: 12 months
View details

Uncompromised

Luxury Class

Custom architecture with 3D visualisation, premium international brands, full interior integration, home automation and a dedicated site engineer from foundation to handover. Ready-mix concrete with cube reports shared at every pour, membrane waterproofing with extended warranty, and unlimited design revisions until you sign off.

  • Best for: Premium residence, custom architecture
  • Design revisions: Unlimited until sign-off
  • Site supervision: Daily site engineer
  • Defect liability: 36 months
View details

Every site is different. Soil conditions, plot orientation, plot size and local approval requirements all affect what your home will cost to build. We provide a detailed, itemised quotation after a site visit and soil assessment — not a rate pulled off a webpage.

Signature Projects

Work we put our name on.

Our Process

How a project actually runs.

Four stages, each with a defined start, a defined finish, and a payment tied to work actually completed.

  1. 01Consultation & site visit

    We walk your plot, check access, soil and setbacks, and give you a realistic budget band before a single drawing is made.

  2. 02Design, drawings & approvals

    Architectural and structural drawings, Vastu alignment where you want it, and every municipal permission filed and followed up by us.

  3. 03Construction & stage checks

    A fixed stage schedule with stage-linked payments. Each stage closes only after its written quality check is signed.

  4. 04Handover

    A joint walkthrough, the snag list cleared, then documents, test records and warranties handed to you in one file.

Quality Assurance

A contractor promises quality.
A firm publishes the checks.

Eight checks, run on every project, recorded and signed before the next stage begins. You receive the complete record at handover — including the ones that failed first time and what we did about them.

Brick and concrete work in progress behind scaffolding on a building site
See how a project runs
  1. Foundation

    Soil & foundation verification

    Bearing capacity confirmed on site before footing depth is fixed. No assumed depths carried over from a nearby plot.

  2. Foundation

    Steel bar-bending inspection

    Diameter, spacing, lap length and cover checked against the structural drawing before any pour. Photographed and filed.

  3. Structure

    Concrete grade & cube testing

    Mix design confirmed, and cube samples tested at 7 and 28 days. You receive the lab results, not a verbal assurance.

  4. Structure

    Curing compliance log

    Curing recorded daily for the full period. Most long-term cracking in Assam homes begins with curing that was cut short in a dry week.

  5. Services & finishes

    Waterproofing & damp check

    Roof, terrace, bathrooms and plinth ponding-tested before any finish goes on. Non-negotiable in a state with this much rainfall.

  6. Services & finishes

    Concealed services testing

    Plumbing pressure-tested and electrical circuits megger-tested before walls are closed. A leak found after plastering is your money, not ours.

  7. Services & finishes

    Finish & level tolerance

    Plaster plumb, floor level and tile alignment checked against a written tolerance with a spirit level and straightedge — not by eye.

  8. Handover

    Pre-handover snag round

    A joint walkthrough with you, everything listed, everything closed. Nothing is signed off while an item is open.

If a check fails, work stops at that stage until it passes. That is the part most clients never see written down.

Brands We Build With

What actually goes
into your house.

Most of a building is hidden once it is finished. These are the parts you cannot inspect later, so we name them before we start.

  • Cement
  • AAC blocks
  • TMT steel
  • TMT steel
  • TMT steel
  • Durgapur Zara
    TMT steel
  • Roofing
  • Tiles & flooring
  • Tiles & flooring

Your quotation names the exact brand for each material, chosen from these, and that is what arrives on site. If we ever have to substitute, we tell you before it happens — not after.

Questions

The things people
actually ask.

If your question is not here, ask it directly — we would rather answer once, properly, than have you guess.

Ask us directly
How much does it cost to build a house in Assam per square foot?

We deliberately do not publish a per-square-foot rate. Every quote you see advertised as a flat rate is either hiding exclusions or will move once someone actually looks at your soil, access and setbacks — and by then you have already committed. We visit the plot for free, then give you a written, itemised cost you can hold us to. It is slower to arrive at and far more useful than a number on a webpage.

How long does it take to build a house?

For a standard two-storey home, expect a few weeks for drawings and approvals, then the construction schedule itself. We give you a stage-wise timeline before work starts and tell you up front which stages the monsoon is likely to affect, rather than explaining it later.

Do you handle municipal approvals and permissions?

Yes. Architectural and structural drawings, and every municipal permission, are filed and followed up by us as part of the package. You are not sent to a separate consultant to chase files.

Which brands of cement, steel and paint do you use?

Each package sets the brand tier for every material — reputed ISI-marked, leading national, or premium — and the exact brands are named in your quotation before work starts, so what arrives on site is what you agreed to. The brands we build with are listed on the home page.

Can you build a Vastu-compliant house?

Yes. Vastu alignment is planned at the drawing stage on request, when it costs nothing to accommodate. Raising it after the foundation is set is expensive, so tell us at the first conversation.

What is not included in a package?

Boundary walls, deep or piled foundations on difficult soil, land levelling, government deposits and any specification above your chosen package sit outside it. We list every exclusion in writing with the quotation, rather than leaving them to be discovered mid-build.

How are payments structured?

Payments are tied to stages of work actually completed, not to a calendar. Each stage closes only after its written quality check is signed, and the next payment follows that.

Do you work outside Guwahati?

We are based in Guwahati and build across Assam. Whether a site is workable depends on access and distance rather than district lines — tell us where the plot is and we will say plainly whether we can take it on.

What happens if something goes wrong after handover?

Structural work carries a written warranty, and there is a defect-liability period after handover during which we come back and fix what is ours to fix. You also receive the full record of stage checks and test results, so there is no argument later about what was done.

Do I need to own the plot before contacting you?

No. Plenty of clients talk to us while still shortlisting land, and a site visit before purchase can save an expensive mistake — access, soil and setbacks decide what a plot can actually carry.

Start Here

Let's talk about your plotbefore you spend a rupee on it.

A consultation costs nothing and commits you to nothing. You leave with a realistic budget band and a clear timeline for your own site.